Steady State Solution of Optimal Production Control of a Dynamic Five-Product Manufacturing System with Setup Costs and Setup Time
dc.contributor.author | Onanaye, Adeniyi Samson | |
dc.date.accessioned | 2022-01-25T09:49:24Z | |
dc.date.available | 2022-01-25T09:49:24Z | |
dc.date.issued | 2011-10-03 | |
dc.description | The article contains part of my PhD results. | en_US |
dc.description.abstract | The steady state solution of optimal control of a one-machine five-product manufacturing system with setup changes, operating in a continuous time dynamic environment is considered here. The system is deterministic. When production is switched from one product to the other, a known constant setup time and a setup cost are incurred. Each product has specified constant processing time and constant demand rate, as well as an infinite supply of raw material. The problem is formulated as a feedback control problem. The aim is to minimize the total backlog, inventory and setup costs incurred over a finite horizon. The optimal solution provides the optimal production rate and setup switching epochs as a function of the state of the system (backlog and inventory levels). | en_US |
dc.description.sponsorship | 1. Onanaye, Adeniyi Samson | en_US |
dc.identifier.citation | 1 | en_US |
dc.identifier.issn | 0975-0452 | |
dc.identifier.uri | http://dspace.run.edu.ng:8080/jspui/handle/123456789/836 | |
dc.language.iso | en | en_US |
dc.publisher | International Journal of Numerical Methods and Applications | en_US |
dc.relation.ispartofseries | vol. 5, No. 2;97-114 | |
dc.subject | Optimal Control, Production, Cost Function, Manufacturing and Product Type | en_US |
dc.title | Steady State Solution of Optimal Production Control of a Dynamic Five-Product Manufacturing System with Setup Costs and Setup Time | en_US |
dc.type | Article | en_US |